Decide What Needs to Be Verified and to What Extent
First, clarify the scope you want to verify when a problem is found with a product. Decide with the quality assurance personnel what needs to be connected between your company's products and work, including material reception, manufacturing dates and conditions, inspections, and shipping destinations. Also, confirm customer requirements and agreements specific to each item beforehand.
You don't need to start by transferring all information into a single table. Even if the original records are separate, if you know which number to look at to proceed to the next record, you can consider how to connect them. Start by trying with one item and one manufacturing batch.
Keep Preceding and Succeeding Numbers Each Time a Process is Passed
The following is a fictitious example for considering how to connect numbers. It does not represent actual manufacturing conditions or quality assurance standards. Please determine the necessary items for your company in accordance with your responsible personnel and business transaction conditions.
- Acceptance Record R01: Material number, quantity, date received, responsible person who confirmed.
- Manufacturing Record M01: Acceptance record R01 used, manufacturing date, required conditions and responsible person.
- Inspection Record I01: Corresponding manufacturing record M01, items checked and results.
- Shipping Record S01: Corresponding manufacturing record M01 and inspection record I01, quantity, shipping destination, date.
A Small Question
The shipping record only has the inspection date, and it's unclear which manufacturing batch was confirmed. Which connections need to be supplemented?
If there are multiple manufacturing batches with the same date, the correspondence between inspection and items cannot be determined. Connect which manufacturing number the inspection record targeted, and which confirmed items the shipping record delivered.
Before creating a new number format, check if there are combinations in the current records that allow for unique correspondence verification. Avoid filling in unconfirmable correspondences with guesswork.
Do Not Omit Scenarios of Splitting, Consolidating, or Reworking
When using one material for multiple manufacturing batches, record what was passed to which manufacturing number. When using multiple materials together, correspondence with the numbers before consolidation is necessary. If you consider the process to be a simple straight line, these transfer records tend to be omitted.
Even in cases of rework or remanufacturing, do not delete the original records and keep only the new numbers. Record which records were changed and what was confirmed. The necessary record items and storage handling should follow your workplace's quality control arrangements. This article alone cannot determine compliance with specific systems or certifications.
Try Tracing from Shipping to Materials, and from Materials to Shipping Destinations
Whether records are connected can be confirmed by actually tracing one case. First, select a shipping record and go back to the inspection, manufacturing, and material records. Next, select one material record and find the manufacturing batches it was used in and their shipping destinations. Trying both the backward and forward directions will reveal omissions that might not have been noticed from only one side.
If you stop midway through searching, distinguish whether the correspondence for a certain number was missing, the record's location was unknown, or the reader couldn't open it. Do not use this as a reason to blame the person recording; instead, consider at which point in the handover the information should be supplemented. For actual items suspected of having problems, do not proceed with shipment based on self-judgment, but follow your workplace's verification procedures.
This Week, Look for Gaps in Records Within a Single Batch
Before introducing new tools, try tracing a single batch using your existing records. Keep track of parts where correspondence was confirmed and parts where it couldn't be, and check if someone else can find it from the same point even if the person in charge changes. Ambiguous correspondences should be clarified with the original records or relevant personnel before being supplemented.
When expanding the scope, standardize the meaning of numbers, recording timing, and correction methods across different lines or sites. Do not judge completeness solely by the volume of records; instead, check if the before-and-after relationships can be explained when needed.
Key Points of This Article
- Connect materials, manufacturing, inspection, and shipping with record numbers.
- Retain records before and after splitting, consolidating, or reworking.
- Trace a single record in both directions and fix disconnected parts.