Technical document

Reasons why AI implementation PoCs don't proceed to production

We will break down the four structural reasons why PoCs stall, explain scope design using the CDM method, withdrawal criteria decided before starting, and parallel consideration of a production checklist.
AI Adoption / IT Consulting~13 minPublication Date September 22, 2026Update date September 22, 2026
Reasons why AI implementation PoCs don't proceed to production

Summary

Key points of this document

  • The reasons why PoCs stall are concentrated in four areas.
  • Fix the scope in one sentence using the CDM method.
  • Withdrawal criteria are decided before starting.

Overview

"We did an AI PoC. The demo worked. But it's not moving to production." This is the most common consultation in AI implementation support. We will structurally break down the reasons why PoCs stall, explain how to apply the CDM method to PoC scope design, and the withdrawal criteria that should be decided at the outset.

The reasons why PoCs stall are concentrated in four areas.

First, the success criteria are not defined. A PoC that starts with "Let's just try something with AI" loses its purpose the moment the demo works, ending with "That was interesting."

Second, the PoC's focus is set on technical validation, omitting business validation. Whether AI can summarize meeting minutes is a technical question. Who checks the summary, when, and who is responsible for errors are business questions. It is almost always the latter that stops production implementation.

Third, incorrect scale setting. Large company-wide themes involve too many stakeholders, making decision-making impossible for anyone. Fourth, ambiguous units for measuring cost-effectiveness. "Somewhat convenient" will not pass approval.

Fix the scope in one sentence using the CDM method.

The CDM method is a requirements definition method that fixes requirements at three points: Who, What, and Why. When applied to an AI PoC, the scope takes the form of: "Verify if Tanaka, an accounting staff member, can reduce the 3 hours spent at the beginning of each month on journal entry creation for invoices to 30 minutes through AI-powered automatic generation of journal entry candidates, in order to accelerate monthly closing by 2 business days."

By making "Who" a specific individual's name, the parties involved in the verification and the witnesses to success are determined from the start. Collective nouns are prohibited. By making "What" a specific task, measurability is ensured. By making "Why" the higher-level objective of "What," the decision-maker for production implementation becomes clear. The reporting destination for the PoC must not be someone who wants to see a demo, but rather the owner of the "Why."

In practice, we list 5 to 10 candidates in this format and prioritize them along two axes: ease of measuring effects and fewer stakeholders. This is because the primary deliverable of the first PoC is not the implementation effect, but rather the verification of "whether the AI implementation decision-making process functions in this company."

Withdrawal criteria are decided before starting.

Humans cannot stop a project that is already in motion. Document the conditions for stopping before sunk costs accumulate, i.e., before starting.

There are three types of withdrawal criteria. Quality criteria: when output accuracy does not meet business requirements. It's important to decide "who will judge with which samples," not just the accuracy number itself. Operational criteria: when the operation to check AI errors does not function in the field. Usage rates don't lie. Economic criteria: when the estimated cost of production implementation exceeds the value defined by "Why."

Withdrawal is not a failure. A PoC stopped based on withdrawal criteria leaves the organization with the insight that "this task is not yet suitable for AI." The worst scenario is a PoC that drifts without a decision. Drifting systematically damages organizational expectations for AI.

We consider the hurdles to production implementation from the start.

During the PoC planning phase, we list the items necessary for production implementation: automatic data integration, permissions and auditing, escalation paths for exception handling, user training, and AI governance (classification of permissible input information, person responsible for output).

These are written down as a "production checklist" at the start of the PoC and considered in parallel during the PoC period. If consideration begins after the PoC ends, a gap of several months will arise before approval, and momentum will be lost.

The PoC plan should cover 7 items on 1-2 pages.

If these 7 items cannot fit on 1-2 pages, the scope is too large.

  • Scope Definition: One sentence for Who, What, Why.
  • Verification Period: 4-8 weeks. A PoC longer than this is a sign of an overly large design.
  • Success Criteria: Quantitative criteria including measurement method and evaluator.
  • Withdrawal Criteria: 3 types: Quality, Operational, Economic.
  • Structure: 3 roles: on-site stakeholders, evaluators, technical supporters. The superior must approve the allocation of man-hours for the stakeholders.
  • Production Checklist: Status of consideration for data connection, permissions, exception handling, training, and governance.
  • Reporting Destination and Date: Schedule reporting to the owner of "Why" in advance on the calendar.

The difference between "let's just try it" and "let's design it first" appears in the presence or absence of an approval document.

If the team is reluctant about the PoC, you've chosen the wrong task. If you select tasks that the team wishes would disappear, cooperation will naturally be gained. Tool comparison should be limited to two tools with the same scope and data, and time should be spent on accuracy verification and operational design for your own business rather than tool selection.

Fix the scope with CDM, define the smallest measurable unit, document withdrawal criteria before starting, and proceed with the production checklist in parallel. A PoC that covers these four points, whether successful or withdrawn, leaves progress for the organization.

Technical documents

We will continue to increase technical documentation.

We will continue to organize our thoughts on AI, cloud, business app development, requirements definition, and operational design into documents.

Go to technical documentation list